AGP Picks
View all

Plan ahead for full weekend closure of northbound I-405 in Bothell Nov. 6-9

News originally published by

Washington State Department of Transportation

BOTHELL – People should prepare for another weekend closure of northbound Interstate 405 in Bothell, beginning Friday, Nov. 6, as crews complete the removal of a pedestrian bridge over the highway.

People traveling northbound throughout the region should expect heavier traffic and longer travel times on northbound I-5 and through Bothell as drivers shift their routes during the closure.

Northbound I-405 closure in Bothell

Crews working for the Washington State Department of Transportation will close all lanes of northbound I-405 from State Route 522 to SR 527 from 11 p.m. Friday, Nov. 6, to 5 a.m. Monday, Nov. 9. A detour route will be in place.

The following northbound I-405 ramps also will close:

  • Northeast 128th Street on-ramp
  • Northeast 132nd Street on-ramp
  • Northeast 160th Street on-ramp
  • SR 522 on-ramps
  • Northeast 195th Street on- and off-ramps (Exit 24)
  • SR 527 off-ramp (Exit 26)

During the full closure, crews will remove a portion of the pedestrian bridge at the Canyon Park Park and Ride as part of the I-405/Brickyard to SR 527 Improvement Project.

The pedestrian bridge needs to be removed to make space for expanding I-405 through Bothell. Crews will build a new pedestrian bridge that will connect to the future Stride bus rapid transit station, which is currently under construction in the middle of the freeway. The new bridge will open in 2028.

Canyon Park Park and Ride closure, Nov. 6-9

The Canyon Park Park and Ride will temporarily close from 11 p.m. Friday, Nov. 6, until 5 a.m. Monday, Nov. 9. Crews will also remove the elevator to the pedestrian bridge.

Pedestrians needing to cross I-405 can take Community Transit routes 106 or 120 or follow signs for the temporary construction shuttle.

All bus stops at the park and ride will close for the weekend, with bus service maintained along scheduled routes for alternative pick-up and drop-off locations. More information about the transit reroute is available on the Community Transit blog.

Plan ahead

To help ease congestion and delays, people can use transit and park and ride options, be flexible about travel times and plan ahead using real-time traffic information. These choices can make a meaningful difference during major closures and help keep both travelers and highway crews safe.

Schedule updates will be available on WSDOT’s online Travel Center map, the WSDOT mobile app and the WSDOT Engage page for I-405/SR 167 construction.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Evergreen State Press

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.